<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Repair, Renovate, Remodel</title>
	<atom:link href="http://www.westendumc.org/repair/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.westendumc.org/repair</link>
	<description>It&#039;s our turn to care for the building West End UMC calls home.</description>
	<lastBuildDate>Sun, 12 Feb 2012 01:43:30 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.2.1</generator>
		<item>
		<title></title>
		<link>http://www.westendumc.org/repair/159/</link>
		<comments>http://www.westendumc.org/repair/159/#comments</comments>
		<pubDate>Sun, 12 Feb 2012 01:43:30 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.westendumc.org/repair/?p=159</guid>
		<description><![CDATA[The kitchenettes would get a lot more use if they worked! On the third floor, they’ve traditionally been used for staff lunch preparation and cleanup, coffee making and for members and staff to share treats. The fourth floor kitchenette is needed for children’s snacks and some craft project preparations. Condition:  The kitchenettes on the third [...]]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.westendumc.org/repair/wp-content/uploads/2012/02/5-Header.jpg"><img class="aligncenter size-full wp-image-160" title="#5 Header" src="http://www.westendumc.org/repair/wp-content/uploads/2012/02/5-Header.jpg" alt="" width="500" height="175" /></a>The kitchenettes would get a lot more use if they worked! On the third floor, they’ve traditionally been used for staff lunch preparation and cleanup, coffee making and for members and staff to share treats. The fourth floor kitchenette is needed for children’s snacks and some craft project preparations.</p>
<p><strong>Condition: </strong> The kitchenettes on the third and fourth floors are dated and the plumbing requires repair.  <a href="http://www.westendumc.org/repair/wp-content/uploads/2012/02/Kitchenette.jpg"><img class="alignright size-full wp-image-165" title="Kitchenette" src="http://www.westendumc.org/repair/wp-content/uploads/2012/02/Kitchenette.jpg" alt="" width="240" height="480" /></a></p>
<p><strong>Solution:</strong>  The kitchenettes will get a makeover, the refrigerator/stove units will be removed, and the plumbing will be repaired.  They will undergo a facelift much like the kitchenette in the mailroom next to Reed Hall received last year.</p>
<p><strong>Cost: $6,300</strong></p>
<p><strong>Your Contribution: </strong> Please prayerfully consider how you can help above and beyond your normal pledge giving  to repair our beautiful church building. See the reverse side of this flyer for the project budget.  Your gift will make a difference.</p>
<p><strong>Project Estimate:</strong><br />
Plumbing &#8211; $1,600<br />
Sinks and faucets &#8211; $980<br />
Carpentry &#8211; $1,960<br />
Hardware &#8211; $290<br />
Countertops &#8211; $920<br />
Painting &#8211; $550<br />
<strong>TOTAL $6,300</strong></p>
<p><em><strong>Updates</strong></em></p>
<p><strong>Project #1</strong><br />
Sanctuary Plaster Repair – <em>Complete</em></p>
<p><strong>Project #2</strong><br />
Mcwhirter Hall Restroom Remodel<br />
The contractor has been hired. The first step of the project will be asbestos removal, which will begin at the end of February.  The men’s room will be relocated and the existing women’s room will be spruced up during March and April.</p>
<p><strong>Project #3</strong><br />
First Floor Entry Improvements – <em>Complete</em></p>
<p><strong>Project #4</strong><br />
Fourth Floor Restroom Remodel<br />
The contractor has been hired, and work will begin in March.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.westendumc.org/repair/159/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title></title>
		<link>http://www.westendumc.org/repair/136/</link>
		<comments>http://www.westendumc.org/repair/136/#comments</comments>
		<pubDate>Mon, 22 Aug 2011 17:55:04 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[Project #4]]></category>

		<guid isPermaLink="false">http://www.westendumc.org/repair/?p=136</guid>
		<description><![CDATA[Our young people spend a lot of time on the fourth floor, even if many adults don’t.  In the restrooms, where there were once radiators and sinks, now pipe stubs protrude from the floor and walls. The girls’ restroom lost one of its two sinks in an accident some time ago. Condition: The fourth floor [...]]]></description>
			<content:encoded><![CDATA[<p style="text-align: left;"><a href="http://www.westendumc.org/repair/wp-content/uploads/2011/08/4-Header.jpg"><img class="aligncenter size-full wp-image-137" title="#4 Header" src="http://www.westendumc.org/repair/wp-content/uploads/2011/08/4-Header.jpg" alt="" width="500" height="175" /></a><br />
<a href="http://www.westendumc.org/repair/wp-content/uploads/2011/08/IMG_2404.jpg"><img class="alignleft size-medium wp-image-139" style="margin: 5px; border: 2px solid black;" title="IMG_2404" src="http://www.westendumc.org/repair/wp-content/uploads/2011/08/IMG_2404-300x200.jpg" alt="" width="210" height="140" /></a>Our young people spend a lot of time on the fourth floor, even if many adults don’t.  In the restrooms, where there were once radiators and sinks, now pipe stubs protrude from the floor and walls. The girls’ restroom lost one of its two sinks in an accident some time ago.</p>
<p><strong>Condition:</strong> The fourth floor restrooms are in disrepair.  A number of updates over the years have compromised the functionality and appearance of the facilities.</p>
<p><strong>Solution:</strong>  Both restrooms will be remodeled to meet current codes, with an eye toward functionality and accessibility.</p>
<p><em><strong>Cost: $68,600</strong></em></p>
<p><strong>Your Contribution: </strong> Please prayerfully consider how you can help above and beyond your normal pledge giving to repair our beautiful church building. Your gift will make a difference.</p>
<p><strong>Project estimate:</strong><br />
<em>(All figures include proportionate share of general requirements, permits, fees, general conditions and contingency and include the cost for both restrooms on the fourth floor.)</em><br />
Demolition &#8211; $2,300<a href="http://www.westendumc.org/repair/wp-content/uploads/2011/08/DSC_2238.jpg"><img class="size-medium wp-image-140 alignright" style="margin: 5px; border: 2px solid black;" title="DSC_2238" src="http://www.westendumc.org/repair/wp-content/uploads/2011/08/DSC_2238-300x200.jpg" alt="" width="210" height="140" /></a><br />
Tile &#8211; $20,700<br />
Walls, ceilings and paint &#8211; $8,900<br />
Toilet partitions &#8211; $10,800<br />
Doors, accessories and hardware &#8211; $8,100<br />
Plumbing and HVAC &#8211; $10,900<br />
Design and oversight &#8211; $6,900<br />
<strong>Estimated total cost &#8211; $68,600</strong><br />
<a href="http://www.westendumc.org/give/rrr_donate.html"><br />
You can give online now</a> or place your check in the offering plate on Sunday with RRR in the memo field.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.westendumc.org/repair/136/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>#3 Fundraising Complete/Narthex Work</title>
		<link>http://www.westendumc.org/repair/3-fundraising-completenarthex-work/</link>
		<comments>http://www.westendumc.org/repair/3-fundraising-completenarthex-work/#comments</comments>
		<pubDate>Mon, 15 Aug 2011 20:59:43 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project #1]]></category>
		<category><![CDATA[Project #3]]></category>
		<category><![CDATA[Updates]]></category>

		<guid isPermaLink="false">http://www.westendumc.org/repair/?p=130</guid>
		<description><![CDATA[After just 2 weeks, the funds for the First Floor Entry Way project have been provided! Thanks for your generous support! Work has begun on the waterproofing of the Narthex, a project related to #1. The roofers will begin work on the sanctuary roof soon when temperatures allow.]]></description>
			<content:encoded><![CDATA[<p>After just 2 weeks, the funds for the First Floor Entry Way project have been provided! Thanks for your generous support!</p>
<p style="text-align: left;"><a href="http://www.westendumc.org/repair/wp-content/uploads/2011/08/DSCF7161.jpg"><img class="aligncenter size-medium wp-image-131" style="margin: 5px;" title="DSCF7161" src="http://www.westendumc.org/repair/wp-content/uploads/2011/08/DSCF7161-300x225.jpg" alt="" width="300" height="225" /></a><br />
Work has begun on the waterproofing of the Narthex, a project related to #1. The roofers will begin work on the sanctuary roof soon when temperatures allow.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.westendumc.org/repair/3-fundraising-completenarthex-work/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Update on #2</title>
		<link>http://www.westendumc.org/repair/update-on-2/</link>
		<comments>http://www.westendumc.org/repair/update-on-2/#comments</comments>
		<pubDate>Fri, 12 Aug 2011 08:39:53 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.westendumc.org/repair/?p=127</guid>
		<description><![CDATA[Project #2 Mcwhirter Hall Restroom Remodel Fundraising for the $68,220 project is complete, and the Building Committee is working with the architect and contractor to finalize plans and specs.]]></description>
			<content:encoded><![CDATA[<p>Project #2 Mcwhirter Hall Restroom Remodel<br />
Fundraising for the $68,220 project is complete, and the Building Committee is working with the architect and contractor to finalize plans and specs.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.westendumc.org/repair/update-on-2/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Update on #1</title>
		<link>http://www.westendumc.org/repair/update-on-1/</link>
		<comments>http://www.westendumc.org/repair/update-on-1/#comments</comments>
		<pubDate>Wed, 10 Aug 2011 08:38:04 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.westendumc.org/repair/?p=125</guid>
		<description><![CDATA[Project #1 Sanctuary Plaster Repair Fundraising for the $31,800 project is complete, materials have been ordered, and work is underway on the related project in the narthex.]]></description>
			<content:encoded><![CDATA[<p>Project #1 Sanctuary Plaster Repair<br />
Fundraising for the $31,800 project is complete, materials have been ordered, and work is underway on the related project in the narthex.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.westendumc.org/repair/update-on-1/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title></title>
		<link>http://www.westendumc.org/repair/115/</link>
		<comments>http://www.westendumc.org/repair/115/#comments</comments>
		<pubDate>Mon, 08 Aug 2011 16:34:40 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project #3]]></category>

		<guid isPermaLink="false">http://www.westendumc.org/repair/?p=115</guid>
		<description><![CDATA[&#160; Most members and visitors to West End enter through the “magic doors” on the first floor.  You’ve probably noticed some recent updates that make this lobby more appealing and hospitable. Now, we would like to complete the project. Condition:  There are several pieces of furniture that need to be updated to make this area [...]]]></description>
			<content:encoded><![CDATA[<p>&nbsp;</p>
<p><a href="http://www.westendumc.org/repair/wp-content/uploads/2011/08/3-Header.jpg"><img class="aligncenter size-full wp-image-116" title="#3 Header" src="http://www.westendumc.org/repair/wp-content/uploads/2011/08/3-Header.jpg" alt="" width="500" height="175" /></a></p>
<p>Most members and visitors to West End enter through the “magic doors” on the first floor.  You’ve probably noticed some recent updates that make this lobby more appealing and hospitable. Now, we would like to complete the project.</p>
<p><a href="http://www.westendumc.org/repair/wp-content/uploads/2011/08/IMG_2266.jpg"><img class="alignleft size-medium wp-image-117" style="margin: 10px;" title="IMG_2266" src="http://www.westendumc.org/repair/wp-content/uploads/2011/08/IMG_2266-300x200.jpg" alt="" width="300" height="200" /></a><br />
<strong>Condition: </strong> There are several pieces of furniture that need to be updated to make this area more welcoming.</p>
<p><strong>Solution:</strong>  The Hospitality Committee has coordinated with the Building Committee to specify new paint, some new furniture and better communications equipment.</p>
<p><strong>Cost:  $10,200</strong></p>
<p><strong>Your Contribution:</strong>  Please prayerfully consider how you can help above and beyond your normal pledge giving to update our beautiful church building.  Your gift will make a difference.</p>
<p><strong>Project Estimate:</strong></p>
<ul>
<li>Paint below chair rail &#8211; $500</li>
<li>Trash receptacle &#8211; $150</li>
<li>Six chairs at front entrance &#8211; $1,800</li>
<li>Two chairs flanking chest of drawers &#8211; $1,600</li>
<li>Area rugs and runners &#8211; $1,400</li>
<li>DVD player and flat screen TV, plus electrical &#8211; $1,300</li>
<li>Bench beside elevator &#8211; $750</li>
<li>Location and direction sign &#8211; $200</li>
<li>Display case for archival items &#8211; $2,500</li>
</ul>
<p><strong><a href="http://www.westendumc.org/give/rrr_donate.html" target="_blank">Estimated total    $10,200 &#8211; Give now!</a><br />
</strong></p>
<p><a href="http://www.westendumc.org/repair/wp-content/uploads/2011/08/IMG_2214.jpg"><img class="alignleft size-medium wp-image-120" style="margin: 5px;" title="IMG_2214" src="http://www.westendumc.org/repair/wp-content/uploads/2011/08/IMG_2214-300x200.jpg" alt="" width="300" height="200" /></a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.westendumc.org/repair/115/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>New Restrooms Are Coming!</title>
		<link>http://www.westendumc.org/repair/new-restrooms-are-coming/</link>
		<comments>http://www.westendumc.org/repair/new-restrooms-are-coming/#comments</comments>
		<pubDate>Wed, 27 Jul 2011 16:27:40 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.westendumc.org/repair/?p=110</guid>
		<description><![CDATA[We have surpassed our goal for #2! New restrooms in McWhirter Hall will now be a reality! The surplus will go on to Project #3, which you will find out about soon! Watch for more updates and renovation pics soon!]]></description>
			<content:encoded><![CDATA[<p>We have surpassed our goal for #2! New restrooms in McWhirter Hall will now be a reality! The surplus will go on to Project #3, which you will find out about soon!</p>
<p>Watch for more updates and renovation pics soon!</p>
]]></content:encoded>
			<wfw:commentRss>http://www.westendumc.org/repair/new-restrooms-are-coming/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>#2 &#8211; Close To Our Goal</title>
		<link>http://www.westendumc.org/repair/2-close-to-our-goal/</link>
		<comments>http://www.westendumc.org/repair/2-close-to-our-goal/#comments</comments>
		<pubDate>Tue, 12 Jul 2011 21:50:28 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project #2]]></category>
		<category><![CDATA[Projects]]></category>

		<guid isPermaLink="false">http://www.westendumc.org/repair/?p=106</guid>
		<description><![CDATA[We are closer to our goal of $68,220 to remodel the restrooms in McWhirter Hall. As of Monday, July 12, we need $13,629 to start the renovation. Give now to this project! &#160;]]></description>
			<content:encoded><![CDATA[<p>We are closer to our goal of $68,220 to remodel the restrooms in McWhirter Hall. As of Monday, July 12, we need $13,629 to start the renovation.</p>
<p><a href="http://www.westendumc.org/give/rrr_donate.html">Give now to this project!</a></p>
<p>&nbsp;</p>
]]></content:encoded>
			<wfw:commentRss>http://www.westendumc.org/repair/2-close-to-our-goal/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title></title>
		<link>http://www.westendumc.org/repair/33/</link>
		<comments>http://www.westendumc.org/repair/33/#comments</comments>
		<pubDate>Wed, 08 Jun 2011 16:16:27 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project #2]]></category>

		<guid isPermaLink="false">http://www.westendumc.org/repair/?p=33</guid>
		<description><![CDATA[McWhirter Hall has new flooring, but the restrooms fail to reflect the hospitable nature of our church. Anyone who has taken a peek into the men’s restroom knows the unpleasant truth: it is really a mechanical room with toilet facilities. Condition: The restrooms are in disrepair and are not properly equipped for handicapped individuals. Solution: [...]]]></description>
			<content:encoded><![CDATA[<p><img class="aligncenter size-full wp-image-48" title="#2 Header" src="http://www.westendumc.org/repair/wp-content/uploads/2011/06/2-Header.gif" alt="" width="500" height="150" />McWhirter Hall has new flooring, but the restrooms fail to reflect the hospitable nature of our church. Anyone who has taken a peek into the men’s restroom knows the unpleasant truth: it is really a mechanical room with toilet facilities.</p>
<p><strong>Condition:</strong> The restrooms are in disrepair and are not properly equipped for handicapped individuals.</p>
<p><strong>Solution:</strong> The storage room by the entrance to McWhirter Hall will be converted to a new men’s restroom. This location provides better access for new plumbing, so the men will have an all new restroom for less money than it would take to bring the existing restroom up to date. The women’s room will get a facelift: new fixtures and finishes. Both will be made more accessible.</p>
<p><strong>Cost: $68,220</strong></p>
<p><strong>Your Contribution:</strong> Please prayerfully consider how you can help above and beyond your normal pledge giving to repair our beautiful church building. See the reverse side of this flyer for the project budget. Your gift will make a difference.</p>
<p><strong>Project Estimate</strong><br />
<em>(All figures include proportionate share of general requirements, permits, fees, general conditions and contingency and include cost for both restrooms.)</em><br />
Demolition                                                $5,754<br />
Tile                                                             $17,950<br />
Walls, ceilings and paint                       $10,758<br />
Toilet partitions                                      $9,590<br />
Doors, accessories and hardware       $11,226<br />
Plumbing and HVAC                             $12,942<br />
<strong>Estimated Total Cost                      $68,220</strong></p>
<p><strong><em>Make your contribution online today by clicking here! </em><br />
</strong><em></em></p>
]]></content:encoded>
			<wfw:commentRss>http://www.westendumc.org/repair/33/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Update &#8211; #1Fundraising Complete</title>
		<link>http://www.westendumc.org/repair/update-1-fundraising-complete/</link>
		<comments>http://www.westendumc.org/repair/update-1-fundraising-complete/#comments</comments>
		<pubDate>Wed, 01 Jun 2011 16:13:36 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project #1]]></category>

		<guid isPermaLink="false">http://www.westendumc.org/repair/?p=44</guid>
		<description><![CDATA[UPDATE: Project #1 Sanctuary Plaster Repair Fundraising is complete. $31,800 budget met in five weeks. Work will begin outside in June to waterproof the parapet walls near the pulpit. After the walls have dried, the plaster inside will be repaired. Please be patient, as proper drying will take several months.]]></description>
			<content:encoded><![CDATA[<p><strong>UPDATE: Project #1<br />
Sanctuary Plaster Repair</strong></p>
<p>Fundraising is complete. $31,800 budget met in five weeks. Work will begin outside in June to waterproof the parapet walls near the pulpit. After the walls have dried, the plaster inside will be repaired. Please be patient, as proper drying will take several months.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.westendumc.org/repair/update-1-fundraising-complete/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

